PROJECT SNAPSHOT: Phase 1 of xAI’s Hyperscale Generative AI Colossus Supercomputer Data Center
Project Overview
Plum Gas Solutions partnered with a leading data center developer facing the challenge of rapidly deploying energy infrastructure in under three months. The site required a high-capacity natural gas system capable of powering more than 25 mobile turbines before a connection to the local utility grid could be established.
Plum’s Role
Plum designed and deployed a scalable natural gas infrastructure system that could reliably fuel a fleet of turbines. This solution delivered the primary power needed to bring one of the world’s largest hyperscale generative AI data centers online within an aggressive timeline.
What We Delivered
- Designed and engineered a high-capacity Pressure Regulation System (6,500 MCF/day)
- Integrated custom manifold solutions for steady, regulated flow
- Installed multiple units in tandem to meet rising power demands
- Provided engineering and commissioning services to support the site team
The Impact
In just three months, the Plum system enabled:
- 43.6 million SCF/day of temperature and pressure-regulated gas flow
- Maximum turbine efficiency with reduced downtime and maintenance costs
- A major Tier 1 hyperscale generative AI data center set to go online in record time
Why Plum?
This project underscores Plum’s ability to move fast, engineer scalable solutions, and deliver natural gas infrastructure that meets today’s most demanding energy requirements.